Works – Construction of a new 10m x 5m hotel pool
Infiniti Commercial Pools were contracted by Safeway Developments to assist with the design and construction of a new hotel pool in the remote Pilbara town of Onslow.
Through our extensive network of regional contractors, Infiniti were able to deliver the project in just 90 days. The deadline was critical as the facility was required to be open in time for the 2023 solar eclipse festival held in Onslow.
As the hotel was operating during construction of the new facility, disruption to the guests had to be kept to a minimum during the works.
Infiniti Commercial pools worked with the Department of Health and the Shire of Ashburton to ensure that the new pool was constructed in accordance with the Health Code and that the pool could be opened on-time.